Skip to main content
Stars Architectural Design & Drafting
Start the Dialogue

Get in Touch with Andrew Novak

Have a property design in mind, need council permit documentation, or looking for expert architectural advice? Reach out directly to discuss your goals.

Direct Contact

Melbourne Studio & Consultations

Reach out directly by phone or email for immediate advice, or submit the consultation form with your project details.

Business RegistrationABN: 55 276 587 014
Service Coverage: Pascoe Vale South, Merri-bek, Whittlesea, Darebin, and Greater Melbourne Metropolitan.
Project Inquiry Form

Send Your Project Details

Fields marked with an asterisk (*) are required.

Studio Location

Pascoe Vale South, Victoria

Open in Google Maps
Stars Architectural Studio

26 Turner Street, Pascoe Vale South

VIC 3044, Melbourne Australia

Get Directions
Privacy Preserved • Zero third-party cookies loaded
Knowledge & Process

Frequently Asked Questions

Clear answers about architectural drafting, building permits, council planning, and our Victorian design process.

In Victoria, both architectural designers/draftspersons and architects produce design and construction documentation. An experienced building designer and architectural draftsperson like Andrew Novak (25+ years experience) specializes in practical, buildable, cost-effective residential and commercial working drawings that meet Victorian building regulations, Australian Standards (BCA/NCC), and council requirements, often delivering equal or superior technical clarity at more accessible fee structures.

Yes. Most structural alterations, new residential homes, multi-unit developments, major extensions, and commercial fitouts in Victoria require a formal Building Permit issued by a registered private or municipal building surveyor. To obtain a permit, you need detailed architectural working drawings including existing conditions, site plans, floor plans, elevations, building cross-sections, and construction specifications.

A typical residential concept and working drawing package takes approximately 4 to 8 weeks depending on project scale, complexity, and client feedback turnaround. If your project also requires a Town Planning Permit from your local municipal council (e.g. Merri-bek, Whittlesea, Darebin, Moonee Valley), the council statutory review process may take an additional 3 to 6 months.

Yes. StarsDesign prepares complete Town Planning application packages (including Clause 54/55 ResCode assessments, shadow diagrams, and site analysis) and directly coordinates with private building surveyors, structural engineers, energy raters, and land surveyors to ensure your documentation meets all statutory criteria.